“City in the Desert”, Field Base of the Dengizkulsky Deposit

Year
2007

Client
LUKOIL OC

General Contractor: GLOBALSTROYENGINEERING CJSC.

 

Time of project realization – 6 months in the conditions of a desert. 45 buildings and facailities from foundation to door knob. Mobilization of over 100 specialists of LOMMETA CG.

 

Executed work: manufacture, packaging arrangement, delivery and construction of 45 buildings based on superlight metal frames, “turnkey” provision of the facilities, including the production, package arrangement, delivery and assembly of the building envelopes and all the necessary engineering systems..

 

Systems and materials applied: “LOMMETA” façade system (façade-rail system (FRS)).